The response of the Ministry of
Land and Resources after this quake
Starting the preplanned
emergency response scheme for super geological disaster, organizing
geologists to the disaster area,
establishing the check of the most important hidden troubles and
guiding the evading and prevention and treatment of geological
disaster.
Assembling 7 aircrafts to carry
out the aviatic photography, arranging 6 high resolution radar-remote sensing satellites to get the
remote sensing pictures of the disaster area after the quake. These
measurements had offered 19,000 pieces of relief maps for disaster
relief and 22,000 special maps on analysis of disaster situation and
rescue situation till May 25th
Paying a close attention to the
weather condition and forecasting the happening of geological
disasters, ruling out the hidden
troubles in the area where the water conservancy facilities, roads
and railways, power supply circuit and the communication facilities
stand. And 386 places of great threaten and 34 barrier lake were
discovered.
Offering the mapping ensurence
for the reconstruction. Establishing the emergence-response
check, resuming the mining work,
programming the land for reconstruction and revising the plans of
prevention and treatment for earthquake properly. And ensuring the
land for reconstruction after earthquake, starting the green channel
for the approval of the land, practising special land-supply policy
and enhancing the effort for reclaiming of the destroyed plowland.
|