front |1 |2 |3 |4 |5 |6 |7 |8 |9 |10 |11 |12 |13 |14 |15 |16 |17 |18 |19 |20 |21 |22 |23 |24 |25 |26 |27 |28 |29 |30 |31 |32 |33 |34 |35 |36 |37 |38 |39 |40 |41 |review |
NRL uses a
computerised system, developed in-house in Microsoft Access, to keep track
of equipment maintenance and calibration. As required by the standards, maintenance and calibration of NRL equipment is described in the quality management system documentation. Only equipment that can affect the results obtained needs to be included in the system of calibration and maintenance. This is termed "critical equipment", and is listed separately from non-critical equipment. |